ADU Build Cost Calculator
Estimate the total all-in construction cost for a garden suite, coach house, or basement secondary suite. Sized off Southern Georgian Bay build-cost bands, with contingency, soft costs, and site services broken out.
Planning estimate, not a quote. Actual cost depends on your municipality, lot conditions, and builder. Full disclaimer.
Estimated total build cost
$226,600
That works out to about $302.13/sqft all-in, including contingency, soft costs, and site services.
The breakdown
Base construction cost (new detached build) 750 sqft × $240/sqft | $180,000.00 |
Contingency 12% of base construction cost | $21,600.00 |
Soft costs Design, permits, engineering, survey | $10,000.00 |
Site services allowance Hydro, septic/sewer hookup, driveway — highly site-specific | $15,000.00 |
| Total | $226,600.00 |
Once you know the build cost
The number this tool produces is the input the financing side actually needs. Run it through the ADU Financing Calculator to see how much of it you can actually borrow, or the Garden Suite Build vs. Status Quo calculator for the full net-wealth comparison over time.